El-Hamam agricultural wastewater treatment plant with a capacity of 7.5 million m³/day
Egypt/ 2022
Client: Ministry of Defence Engineering Authority Water Department
Contractor: Metito – Orascom- Arab contractors- Hassan Allam
Scope:
- Erection and welding carbon steel pipes and fitting up to DN 2900mm
- Fabrication dismantling joints ,disk filter, ring flange segments up to DN 2600 mm
- Fabrication , fuel tank up to 80 meter cube